Master Lean Six Sigma Green Belt – International Online Certification Program
01^ed. Online
Modalità: Virtual Classroom
Avvio: 02-03-2026
Modulo 1
Define
02-09 Mar 2026
Modulo 2
Team Management
16-23 Mar 2026
Modulo 3
Define Lean
13-20 Apr 2026
Modulo 4
Measure
27 Apr 2026
04-11-18 Mag 2026
Modulo 5
Analyse
25 Mag 2026
08-15-29 Giu 2026
Modulo 6
Lean Tools for DMAIC
20-27 Lug 2026
Modulo 7
Improve
29-30 Giu 2026
06-13 Lug 2026
Modulo 8
Control
21-28 Set 2026
Modulo 9
Coaching Project Work
30 Mar 2026
19-25 Mag 2026
14 Set 2026
Modulo 10
Certification Exam GB
12-26 Ott 2026
Mod. 1: Define
top
- Choosing Lean Six Sigma
- Integration between the two approaches, when and how together
- The Six Sigma revolution, potential and organizational architecture in manufacturing processes and services
- The DMAIC process
- Applications and results in industry and services
- Set up the project: choose the process or product to be improved
- How to interpret customer needs and turn them into requirements
- Defining the objectives of a project
- Mapping industrial and service processes: SIPOC
- Focus on the problem: Pareto
- Introduction to MinitabTM
Continua a leggere
- Choosing Lean Six Sigma
- Integration between the two approaches, when and how together
- The Six Sigma revolution, potential and organizational architecture in manufacturing processes and services
- The DMAIC process
- Applications and results in industry and services
- Set up the project: choose the process or product to be improved
- How to interpret customer needs and turn them into requirements
- Defining the objectives of a project
- Mapping industrial and service processes: SIPOC
- Focus on the problem: Pareto
- Introduction to MinitabTM
Riduci
Mod. 2: Team Management
top
- Principles and cycle of communication
- Perception and attribution processes
- Team dynamics and spontaneous roles (Contributor, Collaborator, Communicator, Challenger)
- Defining the objectives of a working group
- Processes of clarification, goal sharing, and team motivation
- The role of the team leader: task and relationship orientation
- Success factors of working groups
- Consensus building methods
- Listening and feedback techniques
- Role and composition of a Kaizen Team
- Ground rules for creating and managing an improvement team
- Closing meetings and consolidating learning
Continua a leggere
- Principles and cycle of communication
- Perception and attribution processes
- Team dynamics and spontaneous roles (Contributor, Collaborator, Communicator, Challenger)
- Defining the objectives of a working group
- Processes of clarification, goal sharing, and team motivation
- The role of the team leader: task and relationship orientation
- Success factors of working groups
- Consensus building methods
- Listening and feedback techniques
- Role and composition of a Kaizen Team
- Ground rules for creating and managing an improvement team
- Closing meetings and consolidating learning
Riduci
Mod. 3: Define Lean
top
- Lean Organization and Lean Production
- Continuous Improvement - Kaizen and Kaikaku
- Getting the flow driven by demand
- Mapping industrial and service processes: VSM and Makigami for services
- Calculate Takt time
Continua a leggere
- Lean Organization and Lean Production
- Continuous Improvement - Kaizen and Kaikaku
- Getting the flow driven by demand
- Mapping industrial and service processes: VSM and Makigami for services
- Calculate Takt time
Riduci
Mod. 4: Measure
top
- Identify the possible causes of a defect – Fishbone analysis and Priority Matrix
- Set up a proper data collection for variable and attribute data
- Concepts of normal and binomial distribution
- Sampling methodologies
- What graphical methods to use for descriptive data analysis: Graphical summary, Boxplot, Runchart
- Assessing the capability of manufacturing and service processes: capability indexes, Sigma level and DPMO
- How to check the validity of measurement systems for variable and attribute data: GAGE R&R and Attribute Agreement Analysis
Continua a leggere
- Identify the possible causes of a defect – Fishbone analysis and Priority Matrix
- Set up a proper data collection for variable and attribute data
- Concepts of normal and binomial distribution
- Sampling methodologies
- What graphical methods to use for descriptive data analysis: Graphical summary, Boxplot, Runchart
- Assessing the capability of manufacturing and service processes: capability indexes, Sigma level and DPMO
- How to check the validity of measurement systems for variable and attribute data: GAGE R&R and Attribute Agreement Analysis
Riduci
Mod. 5: Analyse
top
- How and when to use qualitative analysis and quantitative analysis
- Tools for qualitative analysis: 5 whys, cause & effect matrix, gemba walk
- Tools for graphical data analysis: scatter diagram and Matrix plot
- The tools for quantitative analysis: hypothesis testing and regression
- Confidence intervals and roadmap for parametric tests
- Analysis of Variance (ANOVA)
- Simple linear regression
Continua a leggere
- How and when to use qualitative analysis and quantitative analysis
- Tools for qualitative analysis: 5 whys, cause & effect matrix, gemba walk
- Tools for graphical data analysis: scatter diagram and Matrix plot
- The tools for quantitative analysis: hypothesis testing and regression
- Confidence intervals and roadmap for parametric tests
- Analysis of Variance (ANOVA)
- Simple linear regression
Riduci
Mod. 6: Lean Tools for DMAIC
top
- Using Push and Pull - Kanban methods: when and how to use them
- The potential of Just in Time
- Rapid set-up improvement (SMED)
- Standard work in manufacturing and service processes
- The potential of 5S and visual management
- Managing a Kaizen Event
Continua a leggere
- Using Push and Pull - Kanban methods: when and how to use them
- The potential of Just in Time
- Rapid set-up improvement (SMED)
- Standard work in manufacturing and service processes
- The potential of 5S and visual management
- Managing a Kaizen Event
Riduci
Mod. 7: Improve
top
- Generate solutions: creative thinking techniques
- Risk evaluation and pilot tests
- Design of Experiment: full factorial
- Process FMEA
- Implement solutions
Continua a leggere
- Generate solutions: creative thinking techniques
- Risk evaluation and pilot tests
- Design of Experiment: full factorial
- Process FMEA
- Implement solutions
Riduci
Mod. 8: Control
top
- Control Plans
- The importance of Statistical Process Control (SPC)
- The difference between control limits and specification limits
- Control Charts roadmap for the use of control cards.
- The control charts for variables: I-MR, Xbar-R chart
- Attribute control charts: P, NP chart
- Saving calculation
- Continuous improvement opportunities
Continua a leggere
- Control Plans
- The importance of Statistical Process Control (SPC)
- The difference between control limits and specification limits
- Control Charts roadmap for the use of control cards.
- The control charts for variables: I-MR, Xbar-R chart
- Attribute control charts: P, NP chart
- Saving calculation
- Continuous improvement opportunities
Riduci
Mod. 9: Coaching Project Work
top
Coaching Session
Individual meetings to support the setting of project work and project review
Continua a leggere
Coaching Session
Individual meetings to support the setting of project work and project review
Riduci
Mod. 10: Certification Exam GB
top
- Written text: 40 questions (34 multiple choice + 6 open questions)
- Project presentation to Steering Committee
Continua a leggere
- Written text: 40 questions (34 multiple choice + 6 open questions)
- Project presentation to Steering Committee
Riduci
Potrebbe interessarvi anche
Argomenti correlati



S
h
a
r
e